
Everllence to Supply 175D Engines for New Brønnbåt Nord Wellboat in Spain
Cubierto por 3 fuentesPublicado
Everllence signed a contract with the Spanish shipyard Astilleros Zamakona, located in Bilbao, to supply four 12V175D-MEV generator sets for a new live fish carrier (wellboat) ordered by the Norwegian shipowner Brønnbåt Nord, based in Harstad. The vessel, with an overall length of 86.8 meters and a capacity of 5,000 cubic meters, will have hybrid propulsion with batteries and is designed by NSK Ship Design, with delivery scheduled for 2029.
Technical specifications
Each of the four variable-speed generator sets will deliver 2,040 kilowatts at 1,800 revolutions per minute. Everllence's scope of supply also includes permanent magnet alternators, which have a more compact and lighter design than conventional asynchronous equipment, offering high efficiency across a wide speed range and helping to maximize the efficiency of the hybrid propulsion system.
Precedent with the Caspian
The new vessel is an evolution of the Caspian, a 2,800 cubic meter wellboat delivered to Brønnbåt Nord in 2024 that also incorporates Everllence technology, with an 8L27/38 propulsion engine and a 12V175D generator set. Ruben Fernandez, Director of High-Speed Four-Stroke Marine Engines at Everllence, noted that the new order reaffirms the owner's confidence in the performance, reliability and efficiency of the 175D platform for demanding fishing and aquaculture operations.
Alternative fuels
The 175D engine family, available in 12, 16 and 20-cylinder versions with outputs ranging from 1,440 to 4,400 kW, is approved to run on alternative fuels such as FAME and HVO, and is delivered ready for eventual conversion to methanol. Everllence also announced the development of the 175DF-M, a dual-fuel diesel/methanol variant, with first deliveries scheduled for 2027.
Other Zamakona projects
The contract expands Astilleros Zamakona's portfolio in the aquaculture vessel segment, which had already received a similar order from Trident Aqua Services for another hybrid wellboat. The economic value of the engine contract was not disclosed, nor was the total value of the vessel, and no details were given regarding battery capacity or the other suppliers involved in the project.



