
Fincantieri and Leonardo Sign Deal with OCCAR for Third LSS Vessel
Cubierto por 4 fuentesPublicado
- Fincantieri: new contract for the construction of a third LSS unit for the Italian Navy
- Fincantieri y Leonardo firman contrato para la tercera unidad LSS de la Armada Italiana
- €500m deal signed for third Italian Navy logistic support ship, including options
- Fincantieri and Leonardo win €500m third Italian Navy logistic support ship deal
A consortium led by Fincantieri, with the participation of Leonardo, signed an amendment to the contract with the Organisation for Joint Armament Cooperation (OCCAR) for the construction of a third Logistic Support Ship (LSS) intended for the Italian Navy. The agreement, signed on November 26, 2026 at the integrated Muggiano shipyard, has a value of approximately 500 million euros, of which around 88 million euros correspond to options.
Of the total amount, Fincantieri's share amounts to approximately 414 million euros, including around 37.5 million euros in options, while Leonardo's share is approximately 85 million euros, of which about 50 million euros correspond to options. The contract was signed by OCCAR's Director, Joachim Sucker, and by the General Manager of Fincantieri's Naval Vessels Business Unit, Eugenio Santagata, at a ceremony also attended by representatives of the Italian Navy and Leonardo.
The new vessel will be built entirely at Fincantieri's shipyard in Castellammare di Stabia, with delivery scheduled for 2030. The unit will join the already delivered Vulcano and Atlante, which entered service with the Italian Navy in March 2021 and December 2025 respectively, as part of the fleet renewal program known as the "Naval Law".
The third LSS will retain the class's main dimensions: a length overall of approximately 193 metres, a maximum beam of 24 metres, a displacement of approximately 27,500 tonnes and a maximum speed of around 20 knots. Unlike the first two units, it will incorporate the SADOC5 combat management system, enhanced network protection with a higher security classification level, and expanded satellite communication capabilities. Within the Fincantieri group, NexTech will supply the automation systems and cybersecurity infrastructure, while the Mechanical Systems and Components division will provide shaft lines, steering gear, bow thrusters, stabilizing fins and other handling equipment.
The Italian LSS design was also adopted by the French Navy under the FLOTLOG program, which calls for the construction of units derived from the Italian project in collaboration with the Castellammare di Stabia shipyard. Fincantieri's CEO, Pierroberto Folgiero, noted that the new order confirms the strength of the growth trajectory charted for the Defence business and gives concrete substance to the commercial prospects announced in recent months.



