
Norway Funds Onshore Testing of a Naval Nuclear Propulsion System
Cubierto por 3 fuentesPublicado
The Research Council of Norway granted initial funding of NOK 20 million to the Marine Nuclear Propulsion System (MarNuPS) project, equivalent to about $2 million according to Trade news and gCaptain, or $2.1 million according to ports news rusia. The project, led by reactor developer Emerald Nuclear Norway, brings together shipyard Vard, owned by Fincantieri, shipowner Island Offshore, the Norwegian University of Science and Technology (NTNU), Imperial College London and monitoring firm Maskindynamikk. The goal is to develop, build and test an integrated nuclear propulsion system for offshore vessels, with onshore testing scheduled for 2027 and a first shipboard deployment planned for 2031-32.
Testing in Stette
The test facility will be set up in Stette, near Ålesund, where a full-scale representation of the propulsion system to be installed onboard will be built. The system combines a gas-cooled reactor with a supercritical carbon dioxide turbine to generate electricity, along with energy storage, remote monitoring, power management and integrated automation. In this first phase the reactor will be electrically heated, without actual nuclear operation, and the tests will assess normal operation, rapid changes in power demand, stress conditions and crew interaction before moving toward active nuclear operation.
Shipowner Island Offshore aims to become the first offshore support vessel operator to install this technology. Its CEO, Tommy Walaunet, noted that nuclear power can offer a path to decarbonize offshore vessels without sacrificing power, range or operational flexibility. From Vard, Vice President of Research and Innovation Håvard Vollset Lien stated that the funding is a significant signal of Norwegian national support for nuclear applications in the maritime sector, and explained that its subsidiary Vard Electro will use the onshore tests to develop the onboard electrical control systems before moving toward a floating demonstrator.
Business Model and Costs
Emerald Nuclear proposes a leasing model under which the company would retain ownership and operation of the reactor, including the nuclear fuel cycle, while shipowners would pay only for the energy consumed, under its 5-megawatt-electric GEM microreactor technology. Regarding the total cost, Trade news indicated it is likely to exceed $15 million, financed mostly by the project partners, while gCaptain specified that the first phase has an estimated cost of NOK 150 million, about $15.6 million, with additional contributions from participants beyond the state subsidy.
Emerald Nuclear co-founder and commercial director Hallgeir Juliebo stated that the funding confirms the project's momentum and marks the transition from design and analysis to the construction and testing of a complete integrated system. MarNuPS builds on previous NTNU-led projects, NuProShip I, NuProShip II and the SFI SAINT consortium, in which most of the partners already took part. Separately, Fincantieri is studying lead-cooled modular reactors for naval propulsion, as part of its work on integrating nuclear technology into future vessels.



