
Port of Alicante to Add a New Tugboat and Reviews Ship Waste Reception Fees
Cubierto por 4 fuentesPublicado
- El Puerto de Alicante refuerza su capacidad operativa para acompañar el crecimiento de su actividad
- Puerto de Alicante refuerza servicios de remolque y recepción de desechos
- Alicante refuerza su capacidad operativa ante el incremento de tráfico
- Servicios portuarios. El Puerto de Alicante prevé incorporar un remolcador de 50 toneladas de tiro
The Alicante Port Authority is moving forward with adapting its port services to keep pace with the port's growing commercial activity. Among the planned measures is the addition of a new Voith-type tugboat with a minimum bollard pull capacity of 50 tonnes, through an amendment to the Specific Terms and Conditions governing the towage service. The initiative aims to reinforce the safety of maneuvers and expand the port's capacity to handle larger vessels.
Traffic growth
The decision responds to the trend in port traffic: between January and October the port handled 2.79 million tonnes, 20% more than in the same period of 2025, driven especially by containerized cargo, which grew 45.1%. According to Info Puertos, in the same period of 2025 the port had handled 2.33 million tonnes, while in twenty-foot equivalent units the total reached 213,658 TEU, 34.4% more than the previous year.
Statements from the chairman
Luis Rodríguez, chairman of the Alicante Port Authority, noted that the port's growth must go hand in hand with an improved capacity to provide services, anticipating the needs of vessels and companies so that Alicante can continue growing with safety, efficiency and the capacity to take on new operations. Rodríguez added that the goal is not only to increase traffic volumes, but to prepare the port to handle them increasingly well, offering competitive infrastructure for the province.
Review of waste fees
The planning also extends to the service for receiving waste generated by vessels, whose regulations are being reviewed to update their operating and economic conditions. The proposal contemplates updating the fees applicable to waste under Annexes I, IV and V of the MARPOL Convention, which cover oily waste, sewage and garbage generated on board, respectively, while for Annex VI residues, linked to exhaust gas cleaning systems, current fees will remain unchanged.
No confirmed date or unit yet
Info Puertos clarified that this is a planned action and not the immediate entry into service of a new unit, since the announcement does not set a specific date for the tugboat's incorporation nor identify the vessel that will provide the service. The outlet also noted that Voith propulsion, based on a cycloidal system, allows the direction of thrust to be changed quickly, which is useful in confined maneuvering spaces.
Más destacadas
KCC Reroutes Its Vessels to Avoid Key Whale Habitat in the Indian Ocean
Suez Canal: Revenue Jumps 101% and Vessel Transits Rise 35% in November
US Forces Strike and Disable Bulk Carrier Pacific Archer in Gulf of Oman
Port of Gijón grants fee rebate to APM Terminals and moves forward with industrial and cruise projects