
Port of Oakland and WattEV Open Charging Station, Add 300 Tesla Semis
Cubierto por 4 fuentesPublicado
- **Port of Oakland charging up 300 Tesla Semi trucks for zero-emission freight corridor**
- Port of Oakland Opens First Heavy-Duty Electric Truck Charging Depot
- El Puerto de Oakland inaugura la primera estación de carga para camiones eléctricos de servicio pesado
- WattEV opens Oakland truck charging depot for 300 EVs
The Port of Oakland, together with charging infrastructure company WattEV, opened a public charging station for heavy-duty electric trucks, the first of its kind in Northern California. At the same event, the purchase of 300 Tesla Semi electric trucks was announced, which will use the new infrastructure to expand zero-emission freight transport in the region.
Corridor capacity and scope
The WattEV station can simultaneously charge 25 medium- and heavy-duty trucks at up to 240 kilowatts each, or seven trucks at 1.2 megawatts. Its megawatt charging design aims to reduce charging stops to 30 minutes or less, a time that project officials compare to that of a diesel refueling stop. The initiative seeks to establish a “zero-emission charging corridor” connecting the Bay Area with Sacramento, the Central Valley, Nevada and other destinations. The first batch of trucks will arrive before year's end, while the rest will arrive in 2027.
Official statements
Port of Oakland Executive Director Kristi McKenney stated that the industry is making progress in transforming how cargo moves to and from the Oakland Seaport, together with industry partners. For his part, Salim Youssefzadeh, CEO and co-founder of WattEV, noted that until now truck charging infrastructure had been concentrated mainly in Southern California, and highlighted that the project makes it possible to offer zero-emission freight transport from a key port such as Oakland, in coordination with the Bay Area Air District, Tesla and the California Air Resources Board.
Oakland Mayor Barbara Lee stated that the project was shaped with community input and seeks to ensure that the neighborhoods most affected by pollution benefit from the investments being made in the city. The opening ceremony was held at 8407 Edgewater Drive in Oakland, with the participation of representatives from WattEV, the Bay Area Air District, the California Energy Commission, PG&E and officials from the California Air Resources Board, among other agencies.
Project costs
According to WattEV, at current diesel prices, operating the new electric trucks would cost half as much as operating comparable diesel models, although the company did not provide a detailed cost breakdown. FreightWaves estimated that the 300-truck fleet could represent an investment of approximately $87 million, based on a reported price of $290,000 for the 500-mile-range Tesla Semi, although WattEV did not disclose the actual purchase price or the total cost of the Oakland charging station.



