
Port of Los Angeles Releases Draft Environmental Report for Phillips 66 Oil Terminal
Cubierto por 4 fuentesPublicado
- Port of Los Angeles Releases Draft EIR for Marine Oil Terminal and Wharf Improvements Project
- El Puerto de Los Ángeles publica el borrador del Informe de Impacto Ambiental para el Proyecto de Mejoras de la Terminal Marítima de Petróleo y Muelle
- Port of LA releases Draft EIR for Phillips 66 wharf plan
- EE.UU.: Puerto de Los Ángeles publica borrador de informe de impacto ambiental de proyecto de mejora en terminal petrolera
The Port of Los Angeles released the Draft Environmental Impact Report (DEIR) for the proposed improvement project at the Marine Oil Terminal and Wharf located at Berths 148-151 in Wilmington, a facility operated by Phillips 66.
Project Details
Phillips 66 is proposing to construct a new berth facility at Berths 150-151 that complies with MOTEMS (Marine Oil Terminal Engineering and Maintenance Standards). While the new facilities are being built, the existing wharf at Berths 148-149 would continue operating as the Marine Oil Terminal (MOT); once construction is complete, that area would be limited to non-MOT uses, such as storage of topside equipment and occasional mooring of harbor craft to reduce congestion in the channel. Onshore facilities, including pipelines, vapor recovery systems, support systems and tanks, would be modified and upgraded to serve the new loading platform at Berths 150-151.
Timeline and Environmental Review
The project contemplates up to 40 years of continuous operation as an MOT at Berths 148-151, through a new 20-year lease with two optional 10-year extensions. The environmental review process began in February 2023, when the port released an Initial Study/Notice of Preparation (IS/NOP), a document that, along with the DEIR, is available for public review on the Port of Los Angeles website.
Public Participation Opportunities
The port will hold a virtual public meeting via Zoom to receive comments on the DEIR on Wednesday, December 8, at 4:00 p.m., with no advance registration required and with simultaneous Spanish translation available. According to the Port of Los Angeles, written comments may be submitted by email or regular mail until Monday, January 4, 2027, and emailed comments must include the project title in the subject line and the sender's mailing address in the body of the message.



