Media IntelligenceAgenda
/
ESENPT
DataPortuaria
PortsWaterwayBiofuelsForeign TradeLogisticsAgro
DataPortuaria

El portal de referencia del sector portuario y marítimo de Latinoamérica. Noticias, análisis y datos en tiempo real.

Seguinos:

Secciones

AgroAnalysisBiofuelsCruisesCurrent AffairsEnvironment and EnergyForeign TradeInterviewsLogisticsPortsShipbuildingShippingWaterway

Ediciones

ArgentinaBrasilEcuadorEspañaInternacionalMexicoPanamaPeru

Servicios

Media IntelligenceAgenda

Legal

AboutPrivacy policyCookie policyTerms of useContact

© 2026 DataPortuaria. Todos los derechos reservados.

Inicio›Environment and Energy

Serman Assessed Impacts of Argentina LNG Pipelines in Río Negro

The presentation included a horizontal directional drilling crossing of approximately 1,010 meters in the Limay River.

Últ. Actualización 27 de nov 2026|Lectura: 1 min

Serman Assessed Impacts of Argentina LNG Pipelines in Río Negro
Presentación del estudio ambiental de los ductos. Foto: Serman & Asociados.

Seguí a dataPORTUARIA en Google News

Agregá este medio como fuente preferida y no te pierdas las últimas noticias.

Agregar como fuente preferida

Serman & Asociados presented the Environmental and Social Impact Study (ESIA) for the Río Negro sections of the gas pipeline and condensate multiproduct pipeline of Argentina LNG.

According to the consultancy, the study identifies potential impacts and establishes prevention, mitigation, and management measures.

Limay River Crossing

A slide included in the publication describes a crossing of approximately 1,010 meters using horizontal directional drilling. According to that presentation, the technique avoids direct intervention on the riverbed.

The firm highlighted that the public hearing allows for collecting citizen concerns and contributions for the environmental assessment.

Esquema del cruce dirigido del río Limay. Foto: Serman & Asociados.
Temas:LNGInfrastructure
Compartir esta nota

Seguí leyendo

Tenaris to Supply 24-inch Pipes for Argentina LNG Polyduct

IPA Advocates for Strengthening Infrastructure for Bahía Blanca Petrochemical Hub

Clarksons Welcomes Energy Minister to Lowestoft as Vanguard Offshore Wind Projects Progresses

Most read

  1. 01Prefectura Naval Argentina Achieves New Quality Management System Certification
  2. 02Prefecture Officers Participated in a Virtual Refresher Seminar on Port State Control
  3. 03Prefectura Concludes Virtual Refresher Seminar for Port State Control Officers
  4. 04International Maritime Auditors Training Course for ROCRAM Officials Concludes
  5. 05Prefectura Concludes Second Edition of Maritime Traffic Management Operator Course