• 2 min de lectura
• 2 min de lectura

Aker Solutions has signed a significant five-year agreement, valued between USD 50 million and USD 150 million for the company, with Cenovus Energy for engineering and maintenance services at the White Rose field assets.
The field is located approximately 350 kilometers east of the Port of St. John's, in Newfoundland and Labrador, Canada, at the eastern end of the Jeanne d'Arc basin.
The project scope includes comprehensive engineering, maintenance, and operations support for the new West White Rose platform, as well as for the floating production, storage, and offloading (FPSO) vessel SeaRose.
"We will apply our multidisciplinary project execution model to deliver safe, predictable, and cost-effective operations to our customers," stated Paal Eikeseth, Executive Vice President and Head of Aker Solutions' Life Cycle business.
Since 2005, Aker Solutions has provided offshore engineering services to the White Rose field, including the tow and installation of the concrete gravity structure (CGS), onshore commissioning, and offshore hook-up and commissioning for the new West White Rose platform, with production expected to begin in 2026.
Aker Solutions has also been providing engineering, procurement, and construction management (EPCM) services to the SeaRose FPSO since 2005, including onshore engineering, procurement, and work preparation for the FPSO's recent life extension dry dock (LED) campaign in 2024.
The work will be directed from Aker Solutions' St. John's office, with approximately 120 employees involved both onshore and offshore.
"Aker Solutions has provided multidisciplinary services in the East Coast region for over 30 years. We value our long-standing collaboration with Cenovus Energy and are proud to continue supporting the development of White Rose, as Canada remains a key market for us," added Eikeseth.
The contract will be recorded as an incoming order in the second quarter of 2026 in the Life Cycle segment.
