
Dredging and infrastructure works aim to prepare Brazilian ports to receive larger vessels. According to Antaq, Brazilian ports handled 1.4 billion tons of cargo in 2025, a volume 6.1% higher than in 2024. The Port of Suape (PE) completed the dredging of its internal channel in January 2026, with an investment of R$ 247 million, and the Port of Rio de Janeiro began operating ships up to 366 meters long.








