
Current Affairs
ASIPONA CONTINUES BOULEVARD RESURFACING
The National Port System Administration of Manzanillo (ASIPONA) continues the resurfacing of Boulevard Miguel de la Madrid Hurtado between San Pedrito and Valle de las Garzas. This Wednesday, patching began in Tapeixtles, between the SSA México pedestrian bridge and the Fondeport bridge. The work is expected to be completed in two or three weeks, during which the high-speed lane will be closed.