27 May 2026
During a carefully planned 130-hour shutdown, a concrete conduit was successfully inserted under the railway tracks at the Maasvlakte. This operation marks a significant milestone in the construction of the Maasvlakte Zuid Railway Yard. Installation of the conduit was achieved through close collaboration between the clients – ProRail and Port of Rotterdam Authority – and the contractors: Swietelsky, Van der Linden Beton, Boskalis, De Koning and CT De Boer.



