With the objective of supervising the construction of the bridge over the Santiago stream, an extension of Calle 28 de Agosto, the Director General of the National Port System Administration Manzanillo toured the area this Tuesday morning. After reviewing the progress, he spoke with residents of that demarcation. Moreno Díaz, accompanied by personnel from the Engineering Management, inspected the beams, columns, and slabs of the bridge, walking through the adjacent lands and confirming the advancements in this infrastructure project, which is being built with ASIPONA resources and will benefit at least forty thousand residents of the Santiago Delegation and neighboring communities. ASIPONA contributes daily to improving the quality of life for Manzanillo residents and to the development of the municipality and the State.
ASIPONA Director Oversees Progress of Santiago Bridge
Director General Moreno Díaz supervised the construction of the bridge over the Santiago stream, an extension of Calle 28 de Agosto. Accompanied by personnel from the Engineering Management, he reviewed the beams, columns, and slabs of the project, which is being built with ASIPONA resources. The infrastructure will benefit at least forty thousand residents of the Santiago Delegation and neighboring communities.



