
Ports
Portonave extends pier to 700 meters and enables simultaneous berthing of vessels
Portonave completed the delivery of an additional 250 meters of renovated pier, reaching a total of 700 operational meters. The new section allowed for the simultaneous operation of the vessels CMA CGM Thorium and Mercosul Suape. The adaptation project, which exceeds R$ 2 billion, includes 100% electric equipment for approximately R$ 500 million and prepares the infrastructure for shore power supply.




















