
Ports
Materials Arrive at the Port to Build the Retaining Wall for the New Raos 6 Dock
Sheet piles manufactured by Arcelor Mittal in Luxembourg have arrived at the Port of Santander to construct the new Raos 6 dock. The president of the Port Authority of Santander (APS), César Díaz, reported that the project represents an investment of 22.8 million euros with an execution period of twenty months. The project, carried out by the SIEC-SATO joint venture, will increase port capacity for general cargo and solid bulk.























